In short
A simple five-step protocol to prove enzyme value on your own line before regular supply.
Five steps
- 1. Record a baseline for 3-7 days: yield, time, energy, quality parameters.
- 2. Agree the dose range, addition point, pH and temperature with the selected manufacturer.
- 3. Run lab or pilot tests, then a plant trial at the chosen dose.
- 4. Measure the same parameters and retain samples.
- 5. Calculate payback and fix the regular dose.
What to share with us
Raw material, process flow, pH, temperature, contact time, current chemicals and the outcome you want. All information is kept confidential.
Related
Enquiries are access restricted and may be shared with relevant manufacturers to respond.